Building area 4,145 sq. m, the complex includes 3 residential blocks
Block A is currently under construction and will be completed in 2022.
Delivery condition: ”green frame“ includes the following:
metal-plastic doors and windows with double glazing;
iron entrance door to the apartment;
the balcony is fully lined with ceramic tiles;
the inner walls of the apartment are lined with a light pumice block 10 cm thick;
the walls separating the apartments are lined with a light pumice block 20 cm thick;
the outer walls of the apartment are lined with a light pumice block 20 cm thick;
cement floor screed;
internal wiring of the apartment;
plumbing pipes in the apartment;
installation of meters (electricity, gas, water);
pipelines of the heating system from the heating boiler to the radiator;
gas supplied to the apartment (2 points, on the balcony and kitchen);
the internet brought to the floor;
installation of a plasterboard ceiling;
plastered ceiling and walls
Advantages:With installment plan of 3 years